These are mostly the timeouts that I think we're still hitting in CI.
At this point, the tests (on master) pass on my local machine (which is quite beefy) so I think this is just the first in (perhaps?) a sequence of changes that attempt to change timeouts and load patterns so that the tests pass in CI more reliably.
In the transaction load generator, the e2e test harness previously distributed load randomly to hosts, which was a source of test non-determinism. This change distributes the load generation to the different nodes in the set in a round robin fashion, to produce more reliable results, but does not otherwise change the behavior of the test harness.